|
oNeTRAK module set, 2 - 4 foot long by 18 inches wide.
Special thanks to Joe Dorner for building the basic framework.
|
|
|
|
| |
After painting layed out the cork roadbed.
|
Preparing to lay track
|
Starting to glue down the track
|
|
|
|
|
|
Electrical connections and testing of track with locomotive
|
Completed testing electrical and switch configurations
|
Air brushing track colors
|
Detail of track coloring
|
|
|
|
|
|
First steps of developing scenery
|
Basic foam to form red rock country
|
Closeup of rock moulds glued in place
|
Next carve the foam
|
|
|
|
|
|
forming terrain
|
forming base for hydrocal shell
|
another view
|
Almost ready for hydrocal shell
|
|
|
|
|
|
Track taped ready to start scenery
|
Hydocal applied to foam
|
Open area for structures
|
Now ready for black wash
|
|
|
|
|
A view from another angle |
Site of distribution center |
Closeup of rocky gorge
|
Track cuts thru the hills |
|
|
|
|
|
Black wash completed
|
Roadway surfaces added
|
Highway runs from one end to other
|
Scenery color coat added
|
|
|
|
|
|
|
|
Paved areas for industry
|
detail of highway bridge
|
Pad for home
|
|
|
|
|
Constructing Switch panel |
Southwestern style house #1 under construction |
Southwester style house #2 just started |
Another view of house #2 |
|
|
|
|
Distribution Center nearing completion |
First buildings added to module |
Wood painted "SNNT" brown |
Another view |
|
|
|
|
|
Highway bridge installed
|
Track cleaned and ready to run
|
Closeup of dwelling on hill with private drive
|
|
|
|
|
|
|
Completed set 1
|
|
|
|